Ramniklal Tulsidas Kotak and other v. Varsha Builders and other
1991-07-30
D.R.DHANUKA
body1991
DigiLaw.ai
JUDGMENT - D.R. DHANUKA J. :---This notice of motion is taken out by the plaintiffs for appointment of Court Receiver, High Court, Bombay, as receiver of the suit land described in Exhibit A to the plaint, for an interim injection restraining defendants Nos. 1 to 13 from carrying on any construction work on the suit land or creating any third party rights in respect thereof or any structure which may be put thereon and also for an interim injunction retraining 14th defendant. Corporation from issuing Completion Certificate or Occupation Certificate in respect of any construction put up on the suit land or any part thereof and for costs of the notice of motion. 2. Relying on the registered deed of conveyance dated 12th September, 1966 duly executed by defendants Nos. 4 and 6 for valuable consideration, copy whereof is annexed as Exhibit C to the plaint, the plaintiffs have filed this suit for a declaration that the plaintiffs are owners of the suit land i.e. the land bearing Survey No. 198 Hissa No. 7 situate in the village of Dahisar, Taluka Borivli, described in Exhibit A to the plaint and shown on the plan at Exhibit B to the plaint. The plaintiffs have sought a further declaration to the effect that none plaintiffs Nos. 1 to 13 have any right, title or interest in the suit land or part thereof. The plaintiffs have sought a declaration to the effect that the various documents relied on by defendants Nos. 1 to 13 referred to in prayer (c) of the plaint are null and void and also a decree for possession, mandatory injunction and various other reliefs. The plaintiffs have sought compensation/mesne profits from defendants Nos. 1 to 13 for their acts of trespass on the suit land in the sum of Rs. 27,26,000/- and a further sum of Rs, 72,000/- per month and various other reliefs. The plaintiffs have south a permanent injunction restraining defendants Nos. 1 to 3 from putting up construction of the suit land or continuing to put up the same. The plaintiffs have sought an order directing the 14 defendant-Corporation-to the effect that the sanction already granted for development on the suit land be suspended and the Municipal Corporation be restrained from issuing Completion Certificate or Occupation Certificate in respect of the structure put on the suit land or any part thereof. 3.
The plaintiffs have sought an order directing the 14 defendant-Corporation-to the effect that the sanction already granted for development on the suit land be suspended and the Municipal Corporation be restrained from issuing Completion Certificate or Occupation Certificate in respect of the structure put on the suit land or any part thereof. 3. The matter was extensively argued. Written submissions have been filed. Compilations have been filed. The relevant facts are short and simple as would be obvious from narration thereof hereinafter. 4. The deed of conveyance dated 12th September 1966, inter alia, states as under: "And the said Vendors do hereby covenant with the Purchasers that the Vendors have this day handed over clear and full possession of the said lands...." The above referred provisions in the deed of conveyance binds the parties. Defendants Nos. 4 and 6 were the Vendors and the suit land. The plaintiffs are purchasers there of. Defendants Nos. 4 and 6 now state that they had never handed over possession of the suit land to the plaintiffs. It is not possible to accept this plea in the face of the conveyance, the execution and registration whereof is admitted by the Vendors. The subsequent event referred to hereinafter support the inference that the provision made in the conveyance to the above effect represent the truth. 5. The said deed of conveyance was duly acted upon. By Mutation Entry No. 3072 dated 27th September, 1967 the names of the plaintiffs were entered in the record of rights. Later on, the said entry was deleted without notice to the plaintiffs and the proceedings in respect there of are now pending before the Additional Commissioner, Konkan Division, Bombay Reference to the material facts having bearing on this aspect will be made in latter part of this order at its appropriate place. 6. On 29th February, 1968, the plaintiffs paid land revenue in respect of the suit land. A copy of the receipt issued by the authorities is annexed as Exhibit E to the plaint. It is averred by the plaintiffs in paragraph 5 of the plaint that after 1968, and revenue was abolished by the Government of Maharashtra. 7.
6. On 29th February, 1968, the plaintiffs paid land revenue in respect of the suit land. A copy of the receipt issued by the authorities is annexed as Exhibit E to the plaint. It is averred by the plaintiffs in paragraph 5 of the plaint that after 1968, and revenue was abolished by the Government of Maharashtra. 7. On coming into the Urban Land (Ceiling and Regulation) Act, 1976, hereinafter referred to as the Ceiling Act, the plaintiffs filed statements and declaration in respect of the suit land with the Competent Authority on 16th June and 17th June, 1976 as per details set out in paragraph 6 of the plaint. Plaintiffs Nos. 1, 2 and 5 claim to be agriculturists holding agricultural lands also, at Bhayander in addition to the suit land. On 31st December, 1979, the plaintiffs submitted a Scheme to the Competent Authority for its sanction to construct house for weaker section of the society under section 20(1) of the Ceiling Act. By a letter dated 22nd December, 1983, the Additional Collector informed the plaintiffs that the Government of Maharashtra had framed guidelines and new Scheme and unless the plaintiffs under the Ceiling Act. Thus the plaintiffs exercised various acts of ownership over the suit land since the year 1966 onwards for at least two decades without any obstruction or objection from anyone. 8. It is saverred in paragraph 8 of the plaint and it believable on balance of probabilities, that till February 1987 the plaintiffs possession of the suit land was not disturbed by anyone. It is alleged by the plaintiffs in the said paragraph of the plaint that in February, 1987, during the course of one of their casual visits to the suit land, the plaintiffs found a signboard in front portion of the land that defendant No. 3 was to develop the said land. On 17th February, 1987 and 17th December, 1987, the plaintiffs addressed letters to the Municipal authorities. The plaintiffs have give details of the trespass noticed in paragraph 11 to the plaint. The plaintiffs made representation to the 14th defendant Corporation not to sanction any plan for construction of the building on the suit land. The plaintiffs relied on the registered Deed of Conveyance in support of their title. By his letter dated 2nd January, 1988.
The plaintiffs have give details of the trespass noticed in paragraph 11 to the plaint. The plaintiffs made representation to the 14th defendant Corporation not to sanction any plan for construction of the building on the suit land. The plaintiffs relied on the registered Deed of Conveyance in support of their title. By his letter dated 2nd January, 1988. The Executive Engineer (Building Proposals) of the 14th defendant - Corporation threatened to approve the plans unless the authentic proof of title in form of 7/12 extract was produced, presumably on the footing that the deed of conveyance was not a title deed. It was an erroneous view to take to put it at the mildest. 9. On 8th January, 1988, the plaintiffs filed a limited suit in the Bombay City Civil Court at Bombay, being Suit No. 228 of 1988, against defendant No. 1 from getting any plans sanctioned in respect of construction work on the suit land. In the said suit, the plaintiffs sought on injunction against defendant No. 1 from putting up any construction on the suit land. The plaintiffs also sought reliefs against the Municipal Corporation of Greater Bombay seeking to restrain it from issuing Commencement Certificate etc. In the notice of motion taken out by the plaintiffs in the said suit, defendant No. 3 filed an affidavit in reply disclosing the factum of cancellation of Mutation Entry No. 3072 by an order dated 30th August, 1968. The plaintiffs say and submit that they were completely in dark about the fact of the alleged cancellation of Mutation Entry No. 3072 or order dated 30th August, 1968. The sub-Divisional Officer in terms observed that he had carefully gone through the entire original record and there was nothing in the record to show that any notice was issued or served on the plaintiffs in respect of the said proceedings. The said proceedings. The said order dated 30th August, 1968 is liable to be treated as honest and nullity, unless it is proved in further proceedings that any notice of the said proceeding was served on the plaintiffs. The Deputy Collector (Appeals) set aside the said order dated 14th June, 1988 principally on the ground that the Sub-Divisional Officer had exercised appellate power after expiry of limitation and had not properly addressed himself to the question of condonation of delay.
The Deputy Collector (Appeals) set aside the said order dated 14th June, 1988 principally on the ground that the Sub-Divisional Officer had exercised appellate power after expiry of limitation and had not properly addressed himself to the question of condonation of delay. Being aggrieved by order No. C/RTS/Appeal No. A-23 of 1988 dated Nil Passed by the Deputy Collector (Appeals), Bombay Suburban District, Bombay the plaintiffs preferred a revision application before the Additional Commissioner, Konkan Division, Bombay, as permissible under section 257 of the Maharashtra Land Revenue Code, 1966. By his order dated 12th January, 1989, the operation of the order passed by the Deputy Collector (Appeals) was stayed. In the result, the order dated 14th June, 1988 passed by the Sub-Divisional Officer is operative and Mutation Entry No. 3072 recording the names of the plaintiffs in the record of rights remains operative. It follows that the order dated 30th August, 1968 passed by the Tahsildar cancelling the said entry does not operate, as it is already set aside and it is even otherwise non est. 10. By an order dated 12th July, 1989, the City Civil Court, Bombay, dismissed Suit No. 228 of 1998, Notice of Motion No. 224 of 1988 and Chamber Summons No. 496 of 1989 for amendment of the plaint, observing in substance that the plaintiffs must file a proper comprehensive suit. Being aggrieved by the said order, the plaintiffs filled an Appeal from Order in this Court on the Appellate Side. By an order dated 5th April, 1990 passed in Civil Application No. 946 of 1989 in A.O.No. 106 of 1990, Brother Justice Dudhat of our Court passed the following order:- "Construction is partly carried out and is still going on. Therefore, the petitioner is not entitled to any interim relief. Whatever construction carried out hence-forth will be subject to ultimate decision in the proceeding." The above referred Appeal from Order and companion matters are pending. In the meanwhile, the plaintiffs have filed this comprehensive suit based on title and have taken out a notice of motion for interim relief already summarised. 11. The case of defendants Nos.
Whatever construction carried out hence-forth will be subject to ultimate decision in the proceeding." The above referred Appeal from Order and companion matters are pending. In the meanwhile, the plaintiffs have filed this comprehensive suit based on title and have taken out a notice of motion for interim relief already summarised. 11. The case of defendants Nos. 1, 2 and 3, in substance and in brief, is as under:- (a) The transaction evidenced by the deed of conveyance dated 12th September, 1966 was hit by section 63 of the Bombay Tenancy and Agricultural Lands Act, 1948 as the plaintiffs were not agriculturists and the sale was effected without permission of the Collector. Defendants No. 4 and 6 had never handed over possession of the suit land to the plaintiffs. The order dated 30th August, 1968 passed by the Tahsildar cancelling. Mutation Entry No. 3072 operates. Defendants Nos. 4 to 9 were co-owners of the said land. The said defendants acquired title by adverse possession against the plaintiffs and become entitled to enter into a fresh transaction with buyer of their choice. (b) (i) By an Agreement dated 15th April, 1982, defendants Nos. 4 to 9 agreed to sell the suit land to defendants Nos. 10 to 13 (ii) On 8th July 1984, defendants Nos. 4 to 6 executed a Power of Attorney in favour of defendant No.3 (iii) By an agreement dated 24th September, 1985, defendants No. 10 to 13 agreed to sell the suit land in favour of defendant No. 2 (iv) By an agreement dated 24th September, 1987, defendant No. 2 transferred the benefit of the Agreement dated 24 the September 1985 in favour of defendant No.1, a firm, in which defendant No. 2 is one of the partners. (c) On 7th July, 1984, defendants No.4 to 9 executed a solemn declaration, copy where of is annexed as Exhibit 'S to the plaint, declaring, inter alia, their title by adverse possession, declaring that the plaintiffs had never come forward to take possession of the suit land, that the whereabouts of the plaintiffs were not known and the plaintiffs are resumed to have died. The said declaration by itself is the strongest proof of manipulation, fraud and dishonesty. The plaintiffs are very much alive and have been residing at the same residential address as set out in the deed of conveyance dated 12th September, 1966.
The said declaration by itself is the strongest proof of manipulation, fraud and dishonesty. The plaintiffs are very much alive and have been residing at the same residential address as set out in the deed of conveyance dated 12th September, 1966. The relevant portion of the declaration reads as under :- "6. We (i.e. defendants No. 4 to 9) further say that at no stage the said Shri Ramniklal Tulsidas Kotak (i.e. plaintiff No.1 herein) and other (i.e. plaintiffs Nos. 2 to 6) have come forward putting up any claim in respect of the said property (i.e. the suit land) or requesting us to give possession of the said property to them and we understand that the said Purchasers (i.e., the plaintiffs herein) are not traceable and we believe that they have died. We further say that the sale is bad, of no effect in law as well as all of us have not agreed to the same. (Emphasis supplied) (d) On 16th April, 1988, defendant No. 1obtained Commencement Certificate. Defendant No. 1 got the Municipal sanction is respect of its building proposals as well as sanction of the concerned authorities permitting non-agricultural use thereof. (e) Defendants No.1 has undertaken construction work in respect of 51 flats and 9 shops by amalgamating three plots, including the suit plot. In so far as the suit plot is concerned, the total F.S.I available was only 12,000 square feet which is utilised for construction of 15 flats only. (f) A specimen of an agreement duly executed between defendant No.1 and one of the flat buyers is produced. To the said agreement, the Certificate of Title dated 20th October, 1987 issued by the Advocates on record for defendants No. 1 to 3 is annexed. The Certificate to Title heavily relies on the declaration made by defendants No. 4 to 9 already referred to hereinabove. In paragraph 8 of the said Certificate of Title, it is stated a under: In our opinion, subject to what is stated hereinabove, the title of the aforesaid owners in respect of the above property is marketable and free from all encumbrances. I shall now deal with the principal contentions arising in this Notice of Motion and record my prima facie finding thereon. (1) It is not possible to accept the plea of defendants Nos. 1 to 9 that the Vendors i.e. defendants Nos.
I shall now deal with the principal contentions arising in this Notice of Motion and record my prima facie finding thereon. (1) It is not possible to accept the plea of defendants Nos. 1 to 9 that the Vendors i.e. defendants Nos. 4 and 6, had never handed over possession of the suit land to the plaintiffs. I am recording this prima facie finding in view of the contents of the deed of conveyance dated 12th September, 1966 to the effect that the Vendors had handed over complete possession of the suit land to the plaintiffs and the conduct of the plaintiffs soon thereafter exercising right of ownership over the suit land i.e. (i) Making of Mutation Entry No. 3072 dated 29th June, 1967 in the revenue records, giving effect to the said Deed of Conveyance; (ii) Payment of land revenue by the plaintiffs; and (iii) Filling of declarations, returns and Schemes by the plaintiffs with the Competent Authority under the Urban Land (Ceiling and Regulation) Act, 1976. (2) The order dated 30th August 1968 passed by the Tahsildar cancelling Mutation Entry No. 3072 is liable to be treated as non est at this stage. The order dated 14th June, 1988 passed by the Sub-Divisional Officer operates. It was in terms stated in the said order as follows:- "I have observed the above facts after verifying the Talathi's records and I am satisfied in the contention of the advocate of the appellants that the mutation has been certified without notice being served on the appellants." (3) Pleas of adverse possession raised by the defendants Nos. 4 to 9 in an attempt to sustain subsequent transactions by the same Vendors who executed the Deed of conveyance dated 12th September, 1966 is false. The said plea is attempted to be supported by the statement on oath made by defendants No. 4 to 9 to the effect that the plaintiffs were not traceable and the plaintiffs are presumed to have died. This assertion is shocking and indicates the scheming and manipulations of the worst kind on the part of defendants No 1 to 9. I have no hesitation in holding prima facie that the plea of adverse possessions as well as the abovereferrd declaration are false. (4) The alleged Agreement of Sale dated 15th April, 1982 between defendants Nos. 4 to 9 and defendants Nos. 10 to 13 is prima facie void.
I have no hesitation in holding prima facie that the plea of adverse possessions as well as the abovereferrd declaration are false. (4) The alleged Agreement of Sale dated 15th April, 1982 between defendants Nos. 4 to 9 and defendants Nos. 10 to 13 is prima facie void. Defendants Nos. 4 to 9 has no title to enter into any such agreement . Defendants Nos. 4 and 6 had ceased to be owners of the suit land on execution of the registered deed of conveyance dated 12th September, 1966. Defendants Nos. 5,7 and 8 and 9 are relatives of defendants Nos. 4 and 6 and are set up merely to confuse the issue without there having been any title to the suit land at any time. The plaintiffs say that defendants Nos. 10 to 13 are non-existent persons. The original agreement dated 15th April, 1982 is not forthcoming. Defendants Nos. 10 to 13 are not produced before the Court in spite of comments from time to time. It was submitted by the learned Counsel for the plaintiffs that the signatures of defendants Nos. 10 to 13 on copy of the alleged agreement dated 15th April, 1982 differ from their signatures on the alleged agreement dated 24th September, 1985. I wanted to investigate the facts further by raising questions to the effect as to whether defendants Nos. 10 to 13 had made any payment to defendants Nos. 4 to 9 by cheque or whether defendants Nos. 10 to 13 had received any payment from defendant Nos. 2 by cheque. No information was made available. Suspicious circumstances affecting the credibility of the defendants and their transactions are too many. Good faith is lacking. Manipulation is the order of the day. Perhaps, the defendant Nos. 10 to 13 were the nominees or benamidars of defendant No.2 If defendants 10 to 13 were bona fide estate dealers, the defendants Nos. 10 to 13 would have appeared at the hearing of the notice of motion, filed their affidavits, produced original documents and answered the queries of the Court. Thus the conduct of defendants Nos. 10 to 13 in relation to the suit transaction as well as defendants Nos. 1 to 3 claiming through them appears to be highly suspicious and blameworthy to put it at the bare minimum. (5) The alleged Agreement dated 24th September, 1985 between defendants Nos.
Thus the conduct of defendants Nos. 10 to 13 in relation to the suit transaction as well as defendants Nos. 1 to 3 claiming through them appears to be highly suspicious and blameworthy to put it at the bare minimum. (5) The alleged Agreement dated 24th September, 1985 between defendants Nos. 10 to 13 and defendants No.2 and the alleged Agreement dated 15th October, 1987 between defendants No.2 and defendant No.1 appear to be illegal and of no legal efficacy and entered into by persons having no title to the suit land. Following additional circumstances emerging from the record throw considerable doubt on the bona fides of defendants Nos. 1 to 9 :- (a) Only on 27th May, 1983, defendants Nos. 4 to 9 filed their return with the Competent Authority under the Urban Land (Ceiling and Regulation) Act, 1976. Why not earlier ? There is no answer. (b) From the document Exhibit 'R' to the plaint, it is sought to be represented to the Court that on 7th July, 1984 defendant No.3 got possession of the suit land from defendants Nos. 10 to 13 with consent of defendants Nos. 4 to 9. It is unbelievable. The whereabouts of defendants Nos. 10 to 13 are no known. According to the defence case, defendant No. 2 as sole proprietor of defendant No.3 entered into an agreement to purchase the said land with defendants Nos. 10 to 13 only on 24th September, 1985. In spite of adverse comments, the defendants No.1 to 3 were unable to disclose whereabouts of defendants Nos. 10 to 13 or to cause production of some of the original documents. (c) On 6th March 1984, a public notice was published in the "Free Press Journal" at the instance of M/s. Divekar Co. stating that their clients were negotiating with defendants Nos. 4 to 9 for purchase of the suit land and the transaction will be completed without reference to any claim if no claims were lodged within 14 days of publication of notice. It is stated by Mr. Samdani, the learned Counsel for defendants Nos. 1 to 3 that the said notice was caused to be issued at the instance of defendant No. 2 in anticipation of finalisation of an agreement between defendant No. 2 and the alleged original owners i.e. defendant No. 3 to 9.
It is stated by Mr. Samdani, the learned Counsel for defendants Nos. 1 to 3 that the said notice was caused to be issued at the instance of defendant No. 2 in anticipation of finalisation of an agreement between defendant No. 2 and the alleged original owners i.e. defendant No. 3 to 9. It is not explained as to what had happened to the alleged agreement dated 15th April, 1982 and whether the said alleged agreement was to be revoked before any agreement was arrived at between defendants Nos. 3 to 9 and defendant No. 2. It is significant that according to the version of defendants Nos. 1 to 3 themselves, no agreement was ever arrived at between defendants Nos. 2 and 3 or between defendants Nos. 1 to 3 on the one hand and defendants Nos. 4 to 9 on the other. it appear to me that the various versions of defendants Nos. 1 to 3 are full of inconsistencies and anomalies for inexplicable reasons. (d) I repeatedly asked the learned Counsel for defendants Nos. 1 to 3 during the course of hearing as to what amount, if any, was paid by cheque by defendant No.2 to defendants Nos. 10 to 13, but no reply was forthcoming. (e) The manner in which the alleged agreements to sell the flats on ownership basis were entered into and the details thereof are placed before the Court is totally unsatisfactory Some of the comments made by the learned Counsel for the plaintiffs appears to be clearly justified and the same are as under :- (i) Most of the agreement are not lodged for registration; (ii) Only two agreements out of 57 bear adhesive stamp of Rs. 10/- each; (iii) Agreement in respect of five flats i.e. Flats Nos. 304, 401, 407,504 and 503 refer to the Agreement dated 15th October 1987 in the recital clause and still purport to be anterior dates i.e. 8th August, 1987, 9th Sept., 1987, 18th August, 1987, 20th August, 1987 and 20th August, 1987. (f) Defendants No. 1 to 3 avoided giving inspection of documents, as obvious from the correspondence between Advocates on record. Forming part of annexures to the affidavit in rejoinder. (g) The affidavit of defendant No. 6 Radhakrishna Harishchandra Patil dated 25th June, 1991 pleading adverse possession is false. Prima facie, the plea of adverse possession is false.
(f) Defendants No. 1 to 3 avoided giving inspection of documents, as obvious from the correspondence between Advocates on record. Forming part of annexures to the affidavit in rejoinder. (g) The affidavit of defendant No. 6 Radhakrishna Harishchandra Patil dated 25th June, 1991 pleading adverse possession is false. Prima facie, the plea of adverse possession is false. (6) The plaintiffs have made out a strong prima facie case of title to the suit land. Prima facie, defendants No.1 to 3 have embarked on a bold speculative misadventure to the prejudice of unwary flat buyers. Defendants Nos. 1 to 3 plead for equitable consideration on the ground of heavy investments already made and the irreparable loss and balance of conscience. Defendants Nos. 1 to 3 also rely on the order of Dudhat, J., dated 5th April, 1990 in Civil Application No. 946 of 1989. Defendants 1 to 3 rely on certificate of fifth issued by their advocates. The plaintiffs have strongly criticised on the Certificate of Title annexed to the printed agreement issued by the advocates on record for defendants Nos. 1 to 3. The consideration of the certificate of title would be a relevant circumstance for disposal of notice of motion for evaluating the case of defendants Nos. 1 to 3 that they have acted bona fide. Since the entire conduct of defendants Nos. 1 to 3 as discussed in this order lacks bona fides, I am not withholding passing of order on this notice of motion. Further orders would be passed later on to the extent necessary. I reserve my comments on the Certificate of Title, as this aspect can be decided in a further order to be passed after the larger questions pertaining to issue of the Certificate of Title are decided after hearing the Bombay Incorporated Law Society. The said questions are as under :- (1) Whether a Certificate of Title to be issued by an Advocate or Solicitor under the Maharashtra Ownership Flats Act must necessarily be unconditional or unqualified or it can be conditional and qualified ? (2) Whether a Certificate of Title can be based can the plea of the Builder that he has completed his title by adverse possession even though his plea is reasonably disputable ?
(2) Whether a Certificate of Title can be based can the plea of the Builder that he has completed his title by adverse possession even though his plea is reasonably disputable ? (3) What is the duty of an advocate or Solicitor while issuing a Certificate of Title vis-a-vis unwary flat purchasers and public interest which he is enjoined to protest under the scheme of the Maharashtra Ownership Flats Act? Mr. Samdani, the learned Counsel for defendants Nos. 1 to 3 submits in alternative that on any view of the matter, the Court ought to restrict the relief to the facts pertaining to the suit land and points out that defendants Nos. 1 to 3 have under taken construction project of 51 flats and 9 shops after amalgamating three plots the suit plot is only one of them. This aspect can be considered after specific affidavit is filed by defendants Nos. 1 to 3 on this issue. 12. In the result, subject to the Court modifying its Order, if it become necessary so to do after the affidavit is filed and parties are heard further on the limited question as aforesaid, I pass the following order in the interest of justice :- O R D E R (a) Pending the hearing and final disposal; of the suit, defendants Nos. 4 to 9 are restrained by an order and injunction of this Court from executing any conveyance in respect of the suit land in favour of defendant No. 1, defendant No. 2 or defendant No.3 or any of their nominees as or anyone else. (b) If defendants Nos. 1,2 and 3 desire to complete the construction of the building, defendants Nos. 1,2 and 3 may do so at their own cost and their own risk subject to result of the suit and subject to further orders of this Court in the proceedings which may follow. The said work shall, however, be done in accordance with the sanctioned plans. (c) Pending the hearing and final disposal of the suit, defendants Nos. 1,2 and 3 shall not hereafter enter into any agreement of sale or letting or any other agreement creating third party rights in respect of any of the flats or shops on the building under third party rights in respect of any of the flats or shops on the building under construction on the suit land or any thereof.
1,2 and 3 shall not hereafter enter into any agreement of sale or letting or any other agreement creating third party rights in respect of any of the flats or shops on the building under third party rights in respect of any of the flats or shops on the building under construction on the suit land or any thereof. (d) Pending the hearing and final disposal of the suit, defendants Nos. 1,2 and 3 are restrained from handing over the possession of any of the flats to any of the flats buyers or shop buyer without prior leave of the Court. (e) Defendants Nos. 1,2 and 3 shall deposit a sum of Rs. 20,00,000/- (Rupees Twenty lacs only) in Court within a period of 12 weeks from today. If the said sum is not deposited, the Court Receiver, High Court, Bombay, shall stand appointed receiver of the suit land and all the structures on the suit land or any part thereof. Even in such an event, the Court Receiver shall allow defendants Nos. 1,2 and 3 to complete the pending construction at their own cost and risk under the supervision of the receiver subject to the result of the suit, if defendants Nos. 1,2 and 3 so desire. (f) In case defendants Nos. 1,2 and 3 deposit a sum of Rs. 20,00,000/- (Rupees Twenty Lacs only) in Court as aforesaid, the Court Receiver shall not take charge of the suit land and structures thereon and defendants Nos. 1,2 and 3 shall be at liberty to apply to this Court for modification of this order including for leave of this Court to obtain conveyance in respect of the suit land in favour of defendants No. 1,2 and 3 or their nominees subject to the result of the suit, provided the party in whose favour the conveyance is executed files a written undertaking with this Court to abide by the result of the suit and also files such other appropriate undertakings as the Court to abide by the result of the suit and also files such other appropriate undertakings as the Court deem fit. In such an event, the defendants Nos. 1,2 and 3 shall be at liberty to apply to the Court for leave to hand over possession of the flats and shops to the flat/shop buyers after notice to all the parties to the suit.
In such an event, the defendants Nos. 1,2 and 3 shall be at liberty to apply to the Court for leave to hand over possession of the flats and shops to the flat/shop buyers after notice to all the parties to the suit. (g) Pending the hearing and final disposal of the suit, the Municipal Corporation of Greater Bombay (defendant No.14 herein) is restrained from issuing Completion Certificate or Occupation Certificate in respect of the suit building or any part thereof without leave of the Court. It will be open to defendants Nos. 1,2,3 and 4 to apply for such leave after notice to all the parties to the suit. (h) Having regard to the gross facts of this case and the length of the hearing, the defendants Nos.1, 2 and 3 are directed to pay the costs of the notice of motion to the plaintiffs fixed as Rs. 5,000/-. The defendants Nos. 4 to 9 are also directed to pay the costs of the plaintiffs fixed at Rs.3,000/-. (i) If the defendants Nos.1, 2 and 3 deposit the sum of Rs. 20 lacs, the Prothonotary and Senior Master shall invest the same in fixed deposit with a nationalised Bank or in some other form with the consent of the plaintiffs and defendants Nos. 1, 2 and 3. 13. The Prothonotary Senior Master to act on certified copy of the minutes. 14. Issue of certified copy expedited. Order accordingly. -----