Research › Browse › Judgment

Gujarat High Court · body

1998 DIGILAW 53 (GUJ)

GUJARAT NAVODAYA MANDAL v. STATE

1998-02-04

S.D.PANDIT, SHARAD D.DAVE

body1998
S. D. PANDIT, J. ( 1 ) GUJARAT Navodaya Mandal, a registered society, registered under thesocieties Registration Act as well as Bombay Public Trusts Act has filed the present petition to challenge the order passed by the respondent No. 2 - Chief wild Life Warden on 8/08/1997 in favour of respondent No. 4 - Reliance petroleum Ltd. (hereinafter referred to as R. P. L. , for short ). ( 2 ) RESPONDENT No. 4 R. P. L. has undertaken "motikhavdi Refinery Project" for the production of petroleum products. Respondent No. 4 R. P. L. in order to function the said project has to import crude oil by seafare and then to refine the same, and to produce the petroleum products in their refinery. For that purpose, they first applied on 2/09/1992 for getting clearance of their project from the State government. By its communication dated 1-10-1992, the State Government agreed to, to give clearance and supported the said project of the R. P. L. On 19/11/1992, the Gujarat Pollution Control Board (G. P. C. B.) also issued necessary N. O. C. for the purpose of setting up the project of R. P. L. Thereafter, the respondent No. 4 R. P. L. approached the Environment Department of the Government of India on 17/07/1996 in order to get clearances under the Environment (Protection) Act, 1986. Government of India gave said clearance on certain conditions on 15/09/1995. Thereafter, the respondent No. 4 applied for the permission under Sec. 2 of the Wild Life (Protection) Act, 1972, (hereinafter referred to as the said Act) and Sec. 2 (ii) of Forest (Conservation) Act, 1980. After getting such clearance the respondent No. 4 approached the respondent No. 2 and respondent No. 2 has passed the order in this regard on 8/08/1997 by which he has permitted laying of pipeline in Marine National Park/sanctuary, Jamnagar which is challenged by the present petitioner inthis petition. ( 3 ) IT is the claim of the petitioner that said order is purported to have bee passed under Sec. 29 of the Wild Life (Protection) Act, 1972. It is the contentio of the petitioner that in the permission granted and the work which the respondei no. 4 R. P. L. is to undertake in pursuance of the said order, would not fall withi the purview of Sec. 29. It is the contentio of the petitioner that in the permission granted and the work which the respondei no. 4 R. P. L. is to undertake in pursuance of the said order, would not fall withi the purview of Sec. 29. Consequently, the respondent No. 2-the Chief Wild Lit warden has no jurisdiction to pass the said order. It is further contended by th petitioner that the said order is contrary to the provisions of the said Act. It contended by the petitioner that said order will cause damage to the forest as we as to the marine life and would also cause damage to the environment. Thus, it claimed that respondent No. 4s project will have disastrous effect on ecology an environment. Therefore, in the circumstances, the petitioner is seeking an order from this Court to strike down the order dated 8/08/1997 by holding that tr respondent No. 2 has no power to pass such an order. ( 4 ) RESPONDENT No. 1 - State of Gujarat, respondent No. 2 - the Chief Wil life Warden and respondent No. 3 - Union of India have opposed the presei petitioners claim. According to all of them, the order in question passed by tr respondent No. 2 - the Chief Wild Life Warden is within the parameters of tli provisions of the said Act and necessary precautions have been taken by the Stal government as well as the Central Government to see that there is necessar protection to the wild life, marine life as well as to the environment. Thus the contend that there is no illegality in passing the order in question and consequenti present petition deserves to be rejected. ( 5 ) RESPONDENT No. 4 has also filed affidavit-in-reply as well as addition; affidavit opposing the present petition. It is contended by the respondent No. 4 th. earlier three proceedings were taken before the Apex Court as well as this Cou to cancel the project in question and all those proceedings were dismissed and i spite of this, without making any reference to those earlier proceedings, the petition has come forward before this Court only with a view to harass the respondent No. 4. earlier three proceedings were taken before the Apex Court as well as this Cou to cancel the project in question and all those proceedings were dismissed and i spite of this, without making any reference to those earlier proceedings, the petition has come forward before this Court only with a view to harass the respondent No. 4. It is the claim of the respondent No. 4 that in order to see that the environrnei and ecology are not damaged and preserved, the R. P. L. has engaged the Counc of Scientific and Industrial Research (C. S. I. R.) as well as the National Institute oceanography (N. I. O.) to survey the project and the area through which the pipelir was to be laid and the project to be implemented. It is the contention of tr respondent No. 4 that these two organizations, viz. . , C. S. I. R. and N. I. O. are prininstitutions for such survey and study and both of these institutions had carried 01 the survey and have cleared the project of R. P. L. It is further contended b respondent No. 4 that the N. I. O. had also taken the approval of the Indian Resource information and Management Technologies Pvt. Ltd. , Hyderabad ( (I. R. I. M. T. ). Sai i. R. I. M. T. conducted a detailed study of the vegetation, morphology and ecologic. features of the intertidal area in question and only after their clearance. N. I. O. hi recommended the special design as per the recommendations made by I. R. I. M. I it is further contended against the claim of the petitioner that on account of tn transfer of crude oil from S. B. M. , to the shore tank, because of the spillage contn system adopted by respondent No. 4, they would not cause any damage to the marir life. They have taken necessary precautions and they are following the methoc which are being followed for the first time in India to see that there is no damag to the marine life as well as to the ecology. It is further contended by the respondent no. 4 that by implementing the project in question, there will be the saving of 300 million dollars per year of foreign exchange. Thus, it is in the National interest to have the project in question. It is further contended by the respondent no. 4 that by implementing the project in question, there will be the saving of 300 million dollars per year of foreign exchange. Thus, it is in the National interest to have the project in question. Said project is also in the interest of State of Gujarat and therefore, in the circumstances also the claim of the petitioner that the respondent no. 4 should not be permitted to act on the said permission to start the work of the project should be rejected. Respondent No. 4 has further stated that the permission granted to the respondent No. 4 by the Government of India as well as the State government are conditional permissions. There are conditions in granting said permission and those conditions which are put in the said permission are put with a view to see that there is proper protection of marine life as well as environment and ecology. Thus. the respondent No. 4 contends that present petition should be rejected. ( 6 ) THERE is no dispute of the fact that the permission dated 8/08/1997 is granted under Sec. 29 of the said Act. Mr. M. C. Bhatt, learned Counsel for the petitioner drew our attention to the provisions of Sees. 27 and 28 of the said Act. Section 27 speaks about the restriction on entry in sanctuary and Sec. 28 makes provisions for the grant of permit for making entry in the sanctuary. Mr. Bhatt vehemently urged before us that if the provisions of these two sections are considered, then it would be quite clear that entry in the forest area should not be granted. He then referred to Sec. 29 of the said Act and according to him, if the provisions of the said Sec. 29 are read carefully, then it would be quite clear that the sanction granted by the respondent No. 2/08/1997 is without the approval of the State Government as required by Sec. 29 and consequently said granting of permission is illegal and invalid. In order to appreciate and consider the said contention of Mr. Bhatt, it is necessary to consider the provisions of Sec. 29 of the said Act. Section 29 runs as under :"29. Destruction, etc. In order to appreciate and consider the said contention of Mr. Bhatt, it is necessary to consider the provisions of Sec. 29 of the said Act. Section 29 runs as under :"29. Destruction, etc. , in a sanctuary prohibited without a permit" :- No person shall destroy, exploit or remove any wild life from a sanctuary or destroy or damage the habitat of any wild animal or deprive any wild animal of its habitat within such sanctuary except under and in accordance with a permit granted by the Chief Wild life Warden and no such permit shall be granted unless the State Government being satisfied that such destruction, exploitation or removal of wild life from the sanctuary is necessary for the improvement and better management of wild life therein authorises the issue of such permit. " (Emphasis supplied) if the above provisions of Sec. 29 are considered, then it would be quite clear that under the said section everybody is prevented : (1)FROM destroying, exploiting or removing any wild life from a sanctuary; (2)FROM destroying or damaging the habitat of any wild animal; (3)DEPRIVING any wild animal of its habitat within such sanctuary except under and in accordance with a permit granted by the Chief Wild Life Warden. Then it further lays down that in case of the destruction, exploitation or removal of wild life from sanctuary, the permission could not be granted unless State government is satisfied that it is for the improvement and better management. If this later part of this Sec. 29 is considered, then it would be quite clear that this later part of Sec. 29 is only referring to the restriction of the State Government being satisfied only in case of destruction, exploitation or removal of wild life. Therefore, if the Sec. 29 is considered as a whole, then it would be quite clear that the destruction or damage to the habitat or any wild animal being deprived of its habitat could be done only with the permission granted by the Chief Wild Life warden. Section 29 does not say that for granting such permission, the Chief Wild lite Warden is required to obtain a permission from the State Government which is to be satisfied that the same is necessary for better management and improvement of wild life. Section 29 does not say that for granting such permission, the Chief Wild lite Warden is required to obtain a permission from the State Government which is to be satisfied that the same is necessary for better management and improvement of wild life. That condition is applicable only in case if there is destruction or exploitation or removal of wild life. ( 7 ) ADMITTEDLY, permission is granted to respondent No. 4 for the purpose of laying pipeline for carrying its crude oil to its refinery project for the purpose of its refining and making many products out of it. Now, when the pipeline is to be put in, naturally the same will cause damage to the habitat of wild animal and there is also likelihood of deprivation of wild animal of its habitat. Consequently, before laying any pipeline, a permission under Sec. 29 must be obtained by the person who intends to lay the pipeline through the forest area. Therefore, if the provisions of Sec. 29 are read carefully, then they do not permit us to accept the contention of Mr. Bhatt that respondent No. 2 has no jurisdiction to grant the permission in question. ( 8 ) THE copy of the permission granted by the respondent No. 2 is produced by the petitioner at page 14 and the respondent No. 4 has also produced a copy of the same at page 75 and if we read the said permission minutely, then it would be quite clear that said permission is granted on certain conditions. The permission is also making a reference to the earlier office orders as well as the granting of permission by Government of India. Those conditions are running as under :-"1. The R. P. L, shall strictly carry out the work as per prescribed conditions imposed and/or the conditions that may be imposed considering the ecological sensitivity of Gulf of Kutch, to ensure the protection of corals and other marine flora and fauna during construction as well as operational phases of the project and shall make necessary contributions in any efforts for cumulative impact assessment studies and tor combined environmental management plan for Gulf of Kutch in view of the State Government letter No. FCA 1097-1153-K dated 27-6-1997. 2. 2. The R. P. L. shall strictly observe compliance of all the conditions and environmental safeguards as imposed by the Government of India vide its Office memorandum No. J-l 101 1. 25/94-IAII (I) dated 15-9-1995 conveying environmental clearance. 3. The R. P. L. shall strictly observe all the conditions in Annexure XVII prescribed under the proposal seeking diversion of forest land of marine facilities for the company by this office letter No. LND/29/a/51/97/3577-79, dated 31-3-1997. 4. The R. P. L. shall also observe such conditions as may be prescribed in future by the Chief Conservator of Forests (Wild Life), Gujarat State, Gandhinagar or by the Government of Gujarat in the best interest of preservation and protection of flora and fauna of the area. 5. Different conditions of GOl imposed by its letter dated 31-7-1997 regarding effective monitoring and development of Marine National Park and Sanctuary while working by user agency in its, should be observed strictly. 6. The Project proponents should transfer the cost of afforestation on degraded mangrove forest land equivalence to the area of Sanctuary and National Park being permitted to work with to safeguard flora and fauna of the Marine National Park. "now along with these conditions, it is also necessary to consider the clearance granted by Government of India in Environment Department by its order dated 15/09/1995. Said order is produced at pages 66 to 72. Now by this letter, the respondent No. 4 was given clearance on certain conditions. Out of those conditions, the to. . owing conditions which are at page 69 are of much importance. They run as under :". . . . . . In addition to the above conditions stipulated for the entire refinery complex, the following specific conditions for the associated, infrastructural facilities should also be implemented. A. SPM AND SUB-SEA PIPELINE. 1. The tank frame should be designed in such a way that the residual flow including floor washing do not percolate the marine areas including the nearby salt pans. Location of SPM/sbm and submarine pipeline should be selected in consultation with N. I. O. , State Pollution Control Board and Government of Gujarat (National marine Park Authority) in such a way that corals and mangroves are not affected. Location of SPM/sbm and submarine pipeline should be selected in consultation with N. I. O. , State Pollution Control Board and Government of Gujarat (National marine Park Authority) in such a way that corals and mangroves are not affected. NECESSARY approvals from the Chief Wild Life Warden, Government of Gujarat should be obtained prior to laying of SDM/cot/sub-Marine/onshore pipeline and necessary details in this regard should be submitted to the Ministry. "now, if the above conditions are considered, then it would be quite clear that by putting the said conditions, necessary steps are taken to protect the environment, marine life as well as ecology. Government of India has also written a letter on 31/07/1997, to the Government of Gujarat. Said letter is at page Nos. 73 and 74 and the relevant portion of the said letter is running as under :-"after careful consideration of the proposal of the State Government, the undersigned on behalf of the Central Government hereby agrees in principle for diversion of 1. 9866 ha. , of forest land and permission for right of way for Marine facilities like laying pipelines and approach facilities for R. P. L. refinery in M. N. P. , and sanctuary in Jamnagar District subject to the following conditions : 1. The legal status of the forest land shall remain unchanged. 2. Transfer and mutation of equivalent non-forest land should be done in favour of State Forest Department. 3. This non-forest land shall be declared as protected forest. 4. The cost of compensatory afforestation shall be deposited in advance with the Forest Department by the user agency at the rate fixed by the Forest Department as per the existing norms. 5. Work in sanctuary/national Park will be taken with the approval of CWLW of the State and subject to such condition as may be laid down by him to safeguard flora and fauna of Marine National Park and sanctuary, Jamnagar. 6. A monitoring committee under the leadership of Marine National Park) having representatives from Ministry of Environment AND Forests, Government of india, National Institute of Oceanography and Project Proposition will be constituted to monitor the conditions imposed by Ministry of Environment and Forests and Chief wild Life Warden of the State, For effective monitoring and development of M. N. P. , this committee should have adequate exposure of latent knowhow on the subject available in the country and abroad. After receipt of the compliance report on the fulfilment the conditions No. 2, 4 and 5 from the State Government formal approval will be issued in this regard under Sec. 2 of the Forest (Conservation) Act, 1980. This order for diversion of forest land to user agency could not be issued by the State Government till formal approval order is issued by this office. " ( 9 ) IF the conditions which are put by the Central Government in giving clearance under the Memorandum dated 15/09/1995 as well as permitting of diversion of 1. 9866 ha. , of forest land by the letter dated 31/07/1997 are read together along with the conditions put by respondent No. 2 in his office order dated 8/08/1997, it would be quite clear the Central Government as well as the State government have taken necessary precautions in order to see that there is proper protection for marine life. ecology as well as environment. If these conditions are taken into consideration, then it would be quite clear that when the respondent No. 2 has granted permission on 8/08/1997, he has passed the said order with a view to see that there is proper management of wild life as well as their improvement. ( 10 ) MR. Bhatt very vehemently urged before us that the respondent No. 2 had not at all taken into consideration the fact that there was no improvement or better management of wild life and consequently the order in question would be illegal and invalid. But in view of the material on record, we are unable to agree with his submission. In our opinion, when the conditions which the Central Government has put while granting clearance under the Environment Act on 15/09/1995 as well as the conditions in the letter of 31/07/1997 are read together, then it would be quite clear that the Central Government had taken necessary precautions to see that there is protection and betterment of wild life and ecology and the respondent No. 2 has also granted permission in question to respondent No. 4 with conditions which would show that the order in question is passed bearing in mind the provisions of the said Act. The Chief Wild Life Warden has filed his affidavit and the said affidavit is at page 162. The Chief Wild Life Warden has filed his affidavit and the said affidavit is at page 162. In the said affidavit in paras 4 and 5 he has stated as under :"i say that a pipeline which is being laid by Reliance Petroleum Ltd. , through marine National Park and Marine Sanctuary is most degraded area of the National park and the Sanctuary which is presently devoid of any vegetation and is occupied by very little marine life. I say that Chief Wild Life Warden while permitting the Reliance Petroleum ltd. for laying the pipeline had laid down certain conditions which ultimately would improve the habitat of the Sanctuary and National Park by planting mangroves and also by providing protection to the Wild Life therein. So there is absolutely nothing wrong in permitting Reliance Petroleum Ltd. , for laying pipeline through the sanctuary and National Park within the conditions that it ultimately would improve the habitat of both Sanctuary as well as National Park. " ( 11 ) IF the above statements made by the Chief Wild Life Warden in his affidavit dated 11/02/1998 are taken into consideration, then it would be quite clear that by permitting respondent No. 4 to make use of some portion of the land from the forest area and/or National Park. it could not be said that there is any likelihood of damage or destruction of the marine life, wild life or ecology or environment. ( 12 ) RESPONDENT No. 4 has stated in page No. 4 of additional affidavit that S. B. M. , is to be located at the water depth of 32 meters beyond the boundary of the Sanctuary and Marine National Park and entire pipe-line is to be certified and notified by lloyds Register Shipping. London to ensure its safety. Then the underbody houses of the S. B. M. . have double carcass (double walled instead of single carcass ). Then the pipeline in the intertidal area will be placed on a trestle (a bridge like construction) and the same will be above water level and will not interfere with the movements of water or any marine life. It is further stated that they have constantly consulted N. I. O. and NEERI at every stage of implementing the project. Then the pipeline in the intertidal area will be placed on a trestle (a bridge like construction) and the same will be above water level and will not interfere with the movements of water or any marine life. It is further stated that they have constantly consulted N. I. O. and NEERI at every stage of implementing the project. It is further stated that the location of refinery and the pipeline connecting the S. B. M. has been selected after giving paramount consideration that it would not affect adversely ecology and environment. There is no material to reject the above claims of the respondent No. 4 R. P. L. ( 13 ) ADMITTEDLY, the present petitioner was not a party to the earlier petitions filed in the Apex Court as well as this High Court. But merely because the petitioner was not a party to those petitions which were filed for objecting the refinery project of the respondent No. 4 - R. P. L. . it could not be said that the same has no bearing on the present proceedings. Those proceedings were also filed by the petitioners in the Public Interest for the protection of environment and ecology. Thus, all these proceedings were filed for the same "interest and claim". Therefore, when the subject-matter of the earlier proceedings and the present proceedings is one and when the petitioners in both proceedings were having the same status, then the earlier decisions will create the general principle of constructive res judicata. In the writ petition No. 3)6 of 1994, the Apex Court has disposed of the petition by passing the following order :"mr. Altaf Ahmed the learned Additional Solicitor General appearing for respondent No. s. 1. 2 and 3 very fairly staled thai the respondents have taken full notice of all the grievances pointed out by the petitioner in this writ petition. He further states that the respondents arc conscious of the environmental protection and would preserve the environment in the process of selling up the refinery. The petition is disposed of. "therefore, it is incumbent upon the petitioner to show that while granting sanction and permission to the refinery in question, the respondent Nos. I to 3 have not fulfilled the statement made before the Apex Court by giving specific data. But that is not done. Hence, the petitioners petition deserves to the rejected for that failure. "therefore, it is incumbent upon the petitioner to show that while granting sanction and permission to the refinery in question, the respondent Nos. I to 3 have not fulfilled the statement made before the Apex Court by giving specific data. But that is not done. Hence, the petitioners petition deserves to the rejected for that failure. ( 14 ) LEARNED Counsel for the petitioner has cited before us the following cases : (1) Pradeep Krishen v. Union of India and Ors. , 1996 (8) SCC 599 , (2) Tarun Bharat Sangh, Alwar v. Union of India and Ors. , 1992 Supp. (2) SCC 448, (3) Consumer Education and Research Society "suraksha Sankool" v. Union of india and Ors. , 1995 (2) GCD 325 : 1995 (2) GLR 1655 . If the facts of these cases are considered then it would be quite clear that all these cases are not applicable to the facts before us. Even in the first case of 7996 (8) scc 559, the permission granted by the State of M. P. permitting the villagers and persons residing the adjoining forest to pluck tendu leaves was not cancelled by the Apex Court. The Apex Court has directed the State Government to take necessary action to see that there is no shrinkage of the forest. We have already quoted above the conditions put by the State Government as well as the Central Government while granting permission in question and in our opinion those conditions are taking necessary care for the protection of marine life, wild life and environment and therefore, in the circumstances, there is no reason for us to interfere with the order in question by exercising discretionary powers under Art. 226 of the Constitution of India. The Apex Court in the case of Indian Council for Enviro-Legal Action v. Union of India and Ors. , JT 1996 (4) SC 263, in para 31 has observed as under :"while examining the validity of the 1994 Notification, it has to be borne in mind that normally, such Notification are issued after a detailed study and examination of all relevant issues. In matters relating to environment, it may not always be possible to lay down right or uniform standards for the entire country. While issuing the notifications like the present the Government has to balance various interests including economic, ecological, social and cultural. In matters relating to environment, it may not always be possible to lay down right or uniform standards for the entire country. While issuing the notifications like the present the Government has to balance various interests including economic, ecological, social and cultural. While economic development should not be allowed to take place al the cost of ecology or by causing widespread environment destruction and violation, at the same time the necessity to preserve ecology and environment should not hamper economic and other developments. Both development and environment must go hand in hand, in other words, there should not be delopment at the cost of environment and vice-versa but there should be development while taking due care and ensuring the protection of environment. This is sought to be achieved by issuing notifications like the present, relating to developmental activities being carried out in such a way so that unnecessary environmental degradation does not take place. In other words, in order to prevent ecological imbalance and degradation that developmental activity is sought to be regulated. "in our humble opinion, the above observation aptly apply to the proceedings before us. It has been mentioned by the respondent No. 4 in his affidavit, that by the project in question there will be savings of foreign exchange of 300 million US. , dollars per year. Said project will also generate employment opportunities and the project in question is for National interest and particularly in the interest of State of Gujarat. Therefore, taking into consideration this aspect and the fact that both the Central government and State Government have taken necessary precaution in seeing that neither the ecology nor environment is damaged while implementing the project in question, we are, of the opinion that no interference is called for by this Court by exercising the powers under Art. 226 of the Constitution of India. We, therefore, hold that present petition deserves to be rejected. We accordingly reject the same with no order as to costs. ( 15 ) LEARNED Counsel for the petitioner wants us to restrain the respondent No. 4 to proceed further with the project in question as he intends to go before the Apex court against our order. We have rejected the petition on merits by dealing with all the points raised by the petitioner and we have considered in details the pleadings of the parties. We have rejected the petition on merits by dealing with all the points raised by the petitioner and we have considered in details the pleadings of the parties. In our opinion, to allow the prayer of the present petitioner would be allowing travesty of justice. Such a huge project involving crorers of rupees has already been delayed on account of filing of the present petition as well as earlier petitions and we do not find any reason to further stall the same by allowing the present prayer. We, therefore, reject the same. .