Research › Search › Judgment

Madhya Pradesh High Court · body

2004 DIGILAW 4 (MP)

Food Corporation of India v. Babulal Agrawal

2004-01-05

ARUN KUMAR, BRIJESH KUMAR

body2004
ORDER Brijesh Kumar, J. -- 1. Civil Appeal No. 3484 of 1997 has been preferred by Food Corporation of India and others against the judgment and decree passed by the Madhya Pradesh High Court only partly allowing their appeal and modifying the decree of the trial Court to a limited extent to the effect that the respondent would be entitled to damages to be calculated after deducting 6% of the amount payable. The rest of the judgment and decree as passed by the trial Court has been upheld. 2. Whereas Civil Appeal No. 3485 of 1997 has been preferred by M/s. Babulal Agrawal (the plaintiff) against the same judgment and order passed by the Madhya Pradesh High Court, partly modifying the decree of the trial Court permitting deduction of 6% from the amount of damages as decreed by the trial Court. For the sake of convenience, the parties shall be referred to as the plaintiff and the defendant as in the original suit filed by M/s. Babulal Agrawal. 3. Food Corporation of India (for short' 'FCl") invited tenders for hiring plinths for storing food grains. The plaintiff submitted his tender which was ultimately accepted vide letter dated 11.6.1985. The rent was to be @ 40 paise per sq. ft. The acceptance of the tender and the conditions of contract had again been confirmed by the letter dated 19.8.1985 written by the Regional Manager. An agreement dated 12.2.1986 was entered into between the parties. The case of the plaintiff is that the plaintiff had given out to hire the plinths for a period of three years with an option to the defendant to extend by another year. The construction of plinth etc. could not be completed within the time as agreed. However, ultimately it is undisputed that the same was completed and handed over to the defendant on 24.1.1987. No formal lease deed was executed. The defendant, on 26.9.1988, gave fifteen days' notice for vacating the plinths and vacated the same on 10.10.1988. The rent up to the said period was paid. According to the plaintiff, it amounted to breach of the terms of the contract by the defendant; hence it filed a suit for damages for an amount of Rs. 17 lakhs odd. The trial Court decreed the suit for a total sum of Rs. 17,32,709/- with an order for refund of the security and interest thereon. According to the plaintiff, it amounted to breach of the terms of the contract by the defendant; hence it filed a suit for damages for an amount of Rs. 17 lakhs odd. The trial Court decreed the suit for a total sum of Rs. 17,32,709/- with an order for refund of the security and interest thereon. The plaintiff was also al10wed interest on the decretal amount @ 6% p.a. from the date of suit namely, 4.10.1991 til1 the date of payment. 4. Before entering into the points raised before us by the parties, it will be worthwhile to peruse the relevant conditions of the contract dated 12.2.1986. The plinths were to be constructed by the plaintiff over the land owned by him. The relevant conditions of the agreement are as under : 1. Opposite Party 1 would be solely responsible for obtaining necessary permission from the Land Ceiling Authority and sanction for the plan of plinths and other facilities to be constructed from the local bodies like Municipal Authorities or any other competent authority before proceeding with the constructions. 2. The size and height of the plinths and other facilities will be as per specifications laid down in Appendix 'A'. 3. Party I shall be responsible for providing services like electricity, water supply, inner and approach road, fencing at the site as per instructions of Party 2 to be given from time to time and no extra charges would be claimed for the provision thereof. However, the charges for consumption of electricity would be met by the Corporation (Party 2) during the period plinths along with other facilities remain on lease with Party 2. The maintenance of the electric motor utilized for the supply of water will be the liability of Party 1. On failure of water facility through well or tubewell the alternative arrangement for supply of potable water shall be made by Party 1 at his cost. 4 * * * 5. The layout plan indicating the plinths proposed to be constructed roads, office blocks etc. should be got approved by Party 2 before commencement of the work. 6. Opposite Party 2 will have full right to inspect the construction undertaken by Party 1 through its agents/servants/contractors etc. Party 1 shall extend full facilities to Party 2 and its officer to inspect the work while in progress to check the specification. 7. * * * 8. should be got approved by Party 2 before commencement of the work. 6. Opposite Party 2 will have full right to inspect the construction undertaken by Party 1 through its agents/servants/contractors etc. Party 1 shall extend full facilities to Party 2 and its officer to inspect the work while in progress to check the specification. 7. * * * 8. Upon completion of the construction of plinths and other facilities referred to above in all respects and after obtaining a completion certificate from Party 2 or any of its officers nominated by Party 2 in this behalf, Party I would hand over the plinths and other facilities to Party 2 under lease agreement to be executed between the parties in the prescribed pro forma prescribed by Party 2. The necessary stamp duty as per requirement for execution of lease deed shall be borne by Party 1. 9. It is understood that the time is of the essence of this agreement. In the event of any delay in the completion of the plinths and other facilities or if there is faulty workmanship or the structure is found to be defective, Party 2 would not be bound to take the plinths on lease and the earnest money deposited by Party 1 shall be forfeited. The decision of Opposite Party 2 would be final in this regard and shall not he questioned by Party 1. The earnest money shall also be forfeited in case Party 1 alters, modifies the terms of the agreement and withdraws the offer, charges etc. and/or fails to complete the construction of plinths and other facilities within the time stipulated for constructions. 10. - 11. * * * 12. The period of lease will be three years from the date of taking possession of the lease property. Party 2 will be entitled to extend it by a further period up to one year on the same rates, terms and conditions applicable to the lease." 5. The case of the plaintiff was that the claim of the plaintiff for damages is based on breach of conditions of the agreement dated 12.2.1986 since the defendant, instead of occupying the plinth/platform for a period of three years, vacated the same on 10.10.1988 after having taken the possession only on 24.1.1987. Therefore, the defendant was liable to damages at the same rate as the rent for the plinth. Therefore, the defendant was liable to damages at the same rate as the rent for the plinth. The case of the defendant has been that no registered lease deed, as envisaged in the agreement, was executed for a period of three years, hence it was only a tenancy for month to month and under the provisions of section 106 of the Transfer of Property Act, it was legally open for the defendant to terminate the tenancy on fifteen days' notice and vacate the premises. On the pleadings of the parties, the Court framed issues. We are concerned with only Issues 3 and 4 in respect of which arguments have been advanced before us, which are reproduced below: "3. Whether in the absence of the registration of the alleged lease for three years, the tenancy between the parties was monthly and it was liable to termination by notice? 4. Whether the defendants were bound to pay rent for three years on the principle of 'promissory estoppel'?" On both issues noted above, the trial Court has recorded findings in the affirmative but in respect of Issue 3 it has been further held that there was a breach of contract on the part of the defendant. The trial Court has made a detailed discussion while recording the findings as indicated above and came to a conclusion that once the plaintiff had performed his part of the contract and altered his position, namely, having constructed the plinths according to specifications of the defendant, on a condition given out by the defendant that on completion of the construction they would hire the premises for a period of three years, the defendant could not later on back out from such a promise. It has been noted, and rightly so, that in the tender notice as well as in the correspondence it had been clearly given out time and again that the defendant would utilize the plinths constructed by the plaintiff for a period of three years. As a matter of fact, on completion of the construction the defendant did occupy the plinths and had been paying rent as agreed but terminated the tenancy by serving a notice of fifteen days as per the provisions of section 106 of the Transfer of Property Act and vacated the premises on 10.10.1988. As a matter of fact, on completion of the construction the defendant did occupy the plinths and had been paying rent as agreed but terminated the tenancy by serving a notice of fifteen days as per the provisions of section 106 of the Transfer of Property Act and vacated the premises on 10.10.1988. In connection with this point it may be worthwhile to notice that the defendant itself had admittedly written a letter dated 16.10.1986 to United Commercial Bank mentioning therein that the lease was for a period of three years and the rent payable to the plaintiff would be directly remitted to the Bank as against the loan advanced to the plaintiff. 6. Learned counsel for the respondent has also taken us through the correspondence showing that there was an arrangement for deposit of the amount of rent by the defendant in the bank to adjust the loan taken by the plaintiff from the bank for construction of the plinths. The construction was also made in accordance with the designs and specifications as provided and prescribed by FC!. Considering all such facts as were clearly indicated and given out by the defendant for occupying the premises initially for a period of three years and the plaintiff having arranged for the money accordingly by taking loan from the bank, the trial Court, in our view, has rightly held, referring to the earlier decisions of this Court that the defendant could not back out from the promise held out and cannot escape from the liability for damages for breach of the terms of the contract. 7. We may, however, point out that" the learned counsel for the defendant-appellant has laid much emphasis mainly on three points. The first point is that there being no registered lease deed, it was a monthly tenancy and could validly be terminated by giving fifteen days' notice and since the tenancy was terminated accordingly, there was no occasion to saddle the defendant-appellant with the liability of damages. In absence of a registered lease deed, it is contended that it could not be held that the properly leased out to the defendant-appellant was for a period of three years. The other objection which has been raised is that the agreement dated 12.2.1986 required registration under the provisions of the Indian Registration Act. In absence of a registered lease deed, it is contended that it could not be held that the properly leased out to the defendant-appellant was for a period of three years. The other objection which has been raised is that the agreement dated 12.2.1986 required registration under the provisions of the Indian Registration Act. The unregistered agreement would not be admissible in evidence, hence it could not be acted upon. Yet another objection which has been raised is that the suit was filed beyond the period of limitation. In support of the first contention, a reference has been made to section 107 of the Transfer of Property Act, according to which the parties had to execute a registered lease deed but the same was never done. We find that the High Court has rightly dealt with the question while holding that the plaintiff had not filed the suit for enforcement of agreement of lease. It was a suit filed for damages for the breach of contract. It was not a suit for specific performance of the contract. A promise was definitely held out by the defendant to the plaintiff, for occupying the premises for a period of three years at a given rate of rent. The premises were in fact constructed in accordance with the instructions and specifications of the defendant. For raising the construction the plaintiff had raised loans from the bank. Everything happened in accordance with the terms of the contract except that the period of tenancy was interdicted before three years of taking over of the possession by the defendant. It may be observed that even a monthly lease may last for more than a year and for any longer period. In our view, the trial Court and the High Court have rightly held that in absence of any lease deed or a registered lease deed, the nature of the lease would only be that of a monthly lease. But it does not mean that it would deprive the plaintiff of damages for breach of terms of an agreement in accordance with which he had performed his part of the obligation by creating a liability against himself by taking loan from the bank only to be told later that it all will be of no consequence as agreed in the agreement since no lease was executed and registered. The plinths were constructed in accordance with the designs and specifications given by the defendant. It may be of no use to any other person and for any other purpose. In this background, what was held out by the defendant, assumes importance and in case one who holds out a promise, backs out, will have to compensate the party who acted bona fidely on the basis of the promise made. As indicated earlier, even the tender notice, besides other correspondence, all gave out that the defendant would occupy the premises for a period of three years. Everything was acted upon according to the agreement except the execution of a lease deed, hence there was termination of tenancy on fifteen days' notice. The plaintiff is not insisting that the defendant must retain possession for the remaining period or that the tenancy was not terminable; but termination of the tenancy would not necessarily mean that the defendant would also not be liable for compensating for the breach of promise held out in the terms of the agreement which led the plaintiff to undertake the construction and invest money by raising loan. Therefore, in our view, it would not be of much consequence as to whether a lease deed for a lease of three years was executed and registered or not. The execution of the agreement and its existence and its terms and conditions arc not disputed. Nor has it been disputed that it was held out by the defendant that it would occupy the premises for a period of three years extendable by one year at its option .on the rate of rent as agreed between the parties. In the case in hand, the plaintiff is not praying for relief of specific performance. In this view of the matter, we find that the defence put up by the defendant-appellant is not legally tenable. The trial court and the High Court have rightly relied upon the decision of this Court in the case of Union of India v. Anglo Afghan Agencies [ AIR 1968 SC 718 ] where it was held that non-execution of the contract in terms of Article 299 of the Constitution of India does not militate against the applicability of the doctrine of promissory estoppel against the Government. We also find that a reference to some other decisions of this Court, namely, Motilal Padampat Sugar Mills Co. We also find that a reference to some other decisions of this Court, namely, Motilal Padampat Sugar Mills Co. Ltd. v. State of U.P. [ AIR 1979 SC 621 ] and Delhi Cloth and General Mills Ltd. v. Unions of India [ AIR 1987 SC 2414 ] has been rightly made for the proposition of liability of a party on backing out of a promise held out, after making the other party alter his position. 8. On behalf of the defendant-appellant, a reference has also been made to a decision of this Court reported in Anthony v. K.C. Ittoop and Sons [ (2000) 6 SCC 394 ]. An unregistered lease deed intended to be operative for a period of five years, it was held that being an unregistered deed, hence it could not create lease right in view of provisions as contained in section 107 of the Transfer of Property Act and sections 17(1) and 49 of the Registration Act, 1908. This decision, therefore, would not help the defendant-appellant in the instant case since it is nobody's case that right of tenancy was created by virtue of agreement dated 12.2.1986. The said agreement only provided for execution by a registered lease deed. The agreement has never been treated as a lease deed by any Court or the plaintiff-respondent. What has been found material in this case is that right from the beginning with the publication of the tender notice till the end, it was given out, including in the agreement, that the appellant shall hire the premises for a period of three years. This period of three years has been described as guarantee period by the appellant itself during which lease was to continue. We have already held earlier that agreement dated 12.2.1986 itself not being a lease deed was not registrable. The case basically hinges on the undisputed fact that a promise was held out by the appellant to the respondent to hire the premises for three years, in response whereof the respondent had parted with his possession, as held earlier. 9. We have already held earlier that agreement dated 12.2.1986 itself not being a lease deed was not registrable. The case basically hinges on the undisputed fact that a promise was held out by the appellant to the respondent to hire the premises for three years, in response whereof the respondent had parted with his possession, as held earlier. 9. It may also be worthwhile to point out that the Board of Directors of FCI considered the question of premature termination of the lease and in its meeting it realized that though, may be legal, it would be unjust and unfair, hence, issued a circular dated 4.5.1989 saying that the matter was considered in its 194th meeting and it was decided that wherever guarantee period of three years has not expired the hiring of plinths may be continued up to the date of expiry of three years by reducing its liability at least to the extent of 5% in the amount of rent, through negotiations with the owners of the plinths. The defendant itself was well aware of the promise of three years' "guarantee period" , therefore, only wanted reduction in rent. 10. The next submission made on behalf of the appellant is that the agreement dated 12.2.1986 which provided for execution and registration of lease for a period of three years, was itself required to be registered according to section 2(7) of the Registration Act, 1908. Clause (7) of section 2 is quoted below : . "2. Definitions -- In this Act, unless there is anything repugnant in the subject or context, -- (1) - (6) * * * (7) 'lease' includes a counterpart kabuliyat, an undertaking to cultivate or occupy, and an agreement to lease;" It is submitted that since there was an agreement for lease, it was therefore, liable to be registered. In this connection two other provisions, section 17(1) (d) and section 17(2) (v), which may be relevant for the purpose of dealing with this point may also be perused. Section 17(1) (d) reads as under: "17. In this connection two other provisions, section 17(1) (d) and section 17(2) (v), which may be relevant for the purpose of dealing with this point may also be perused. Section 17(1) (d) reads as under: "17. Documents of which registration is compulsory--(1) The following documents shall be registered, if the property to which they relate is situate in a district in which, and if they have been executed on or after the date on which, Act 16 of 1864, or the Indian Registration Act, 1866 (20 of 1866), or the Indian Registration Act, 1871 (8 of 1871), or the Indian Registration Act, 1877 (3 of 1877), or this Act came or comes into force, namely -- (a) - (c) * * * (d) leases of immovable property from year to year, or for any term exceeding one year, or reserving a yearly rent;" The other relevant provision is clause (v) of sub-section (2) of section 17, which reads as under : "17. (2) Nothing in clauses (b) and (c) of sub-section (l) applies to -- (i) - (iv) * * * (v) any document other than the documents specified in sub-section (1A) not itself creating, declaring, assigning; limiting or extinguishing any light, title or interest of the value of one hundred rupees and upwards to or in immovable property, but merely creating a right to obtain another document which will, when executed, create, declare, assign, limit or extinguish any such right, title or interest; or * * * The agreement dated 12.2.1986 would squarely be covered by clause (v) of sub-section (2) of section 17 quoted above, since it merely creates a right to obtain another document which when executed would create such a right. It would be necessary to refer to the conditions of the agreement at this juncture. Clause 8 of the agreement quoted earlier is clear in providing that upon completion of the plinths etc. the premises would be handed over to the defendant under a lease agreement to be executed between the parties in the prescribed pro forma. Thus clause 8 only talks of execution of a lease deed between the parties in a prescribed pro forma under which the defendant would be entitled to get possession of the premises on completion. The necessary stamp duty was to be borne by the plaintiff. Thus clause 8 only talks of execution of a lease deed between the parties in a prescribed pro forma under which the defendant would be entitled to get possession of the premises on completion. The necessary stamp duty was to be borne by the plaintiff. It is thus clear that the agreement dated 12.2.1986 itself is not a lease deed requiring registration. It only creates a right of getting another document executed creating rights and liabilities in respect of immovable property. The trial Court as well as the High Court have in this connection, placed reliance upon a decision in Trivenibai v. Lilabai [ AIR 1959 SC 620 J. Para 15 of the judgment reads as under: "15. In construing this document it is necessary to remember that it has been executed by laymen without legal assistance, and so it must be liberally construed without recourse to technical considerations. The heading of the document, though relevant, would not determine its character. It is true that an agreement would operate as a present demise although its terms may commence at a future date. Similarly it may amount to a present demise even though parties may contemplate to execute a more formal document in future. In considering the effect of the document we must enquire whether it contains unqualified and unconditional words of present demise and includes the essential terms of a lease. Generally if rent is made payable under an agreement from the date of its execution or other specified date, it may be said to create a present demise. Another relevant test is the intention to deliver possession. If possession is given under an agreement and other terms of tenancy have been set out, then the agreement can be taken to be an agreement to lease. As in the construction of other documents, so in the construction of an agreement to lease, regard must be had to all the relevant and material terms; and an attempt must be made to reconcile the relevant terms if possible and not to treat any of them as idle surplusage." It is thus clear that if the agreement is such which may amount to a present demise even though the document may be contemplated to be executed later on, it may be a document or agreement creating the rights. There must be demise of the property ill praesenti. There must be demise of the property ill praesenti. But an agreement for securing another agreement or deed in future would not be such an agreement or document which may require registration. Clause 8 of the agreement did not create any right in praesenti nor was there any immediate demise of the property. It was only an executory agreement. The construction of the plinths, it seems, had yet to start with other facilities and amenities. On completion, such a certificate was to be obtained from the defendant. It was thereafter that the possession was to be handed over under the lease agreement which was to be executed between the pm1ies. The construction was to be strictly in accordance with the directions and specifications of the defendant. Condition 9 also contemplated that if the structure was found defective or workmanship was faulty, the defendant could refuse to take possession of the premises and the earnest money was liable to be forfeited. Hence it is evident that no possession, right or' title had passed on ill praesenti at the time of execution of the agreement, and there were many prior conditions attached thereto. Such an agreement, in our view, has been rightly held to be only an executory agreement and not an agreement creating rights in the immovable property, hence not compulsorily required to be registered. It was a mere agreement between the parties which was not registered but was admissible in evidence. 11. The next contention has been raised that the suit filed by the plaintiff was barred by time. The tender was accepted by the appellant on 11.6.1985. The premises were handed over to the defendant on 24.1.1987. The defendant gave fifteen days' notice to vacate the premises on 10.10.1988, on which date they vacated the premises paying the rent up to 10.10.1988. The suit was filed on 4.10.1991. 12. In connection with this objection regarding limitation, the learned counsel for the plaintiff has submitted that no such plea was ever raised by the defendant nor were any facts or reasons indicated as to in what manner the suit was barred by limitation. No issue was framed on the question of limitation. That point was not raised even in the High Court not in this Court too. It is only in the list of dates/synopsis, it is vaguely stated, that the suit was time-barred. No issue was framed on the question of limitation. That point was not raised even in the High Court not in this Court too. It is only in the list of dates/synopsis, it is vaguely stated, that the suit was time-barred. Learned counsel for the defendant-appellant, however, relying upon section 3 of the Limitation Act submits that it was the duty of the Court to see as to whether the suit was within limitation or not. A suit filed beyond limitation is liable to be dismissed even though limitation may not be set up as defence. The above position as provided under the law cannot be disputed nor has it been disputed before us. But in all fairness, it is always desirable that if the defendant would like to raise such an issue, he would better raise it in the pleadings so that the other party may also note the basis and the facts by reason of which suit is sought to be dismissed as barred by time. It is true that the Court may have to check at the threshold as to whether the suit is within limitation or not. There is always an office report on the limitation at the time of filing of the suit. But in case the Court docs not prima facie find it to be beyond time at that stage, it would not be necessary to record any such finding on the point, much less a detailed one. In such a situation, at least at the appellate stage, if not earlier, it would be desired of the defendant to raise such a plea regarding limitation. In the present case except for making a passing reference in the list of dates/synopsis, no such ground or question has been raised or framed on the point of limitation. It is quite often that question of limitation involves question of facts as well which are supposed to be raised and indicated by the defendant. The objecting party is not supposed to conveniently keep quiet till the matter reaches the apex Court and wake up in a non-serious manner to argue that the Court failed in its duty in not dismissing the suit as barred by time. The objecting party is not supposed to conveniently keep quiet till the matter reaches the apex Court and wake up in a non-serious manner to argue that the Court failed in its duty in not dismissing the suit as barred by time. The trial Court may not find the suit to be barred by time and proceed with the case but in that even the Court would not be required to record any such finding unless any plea is raised by the defendant. In this connection, learned counsel for the respondent has placed reliance upon a decision reported in lttyavira Mathai v. Varkey Varkey [ AIR 1964 SC 907 : (1964) 1 SCR 495 ], SCR at p. 506 wherein it has been held that if it is a mixed question of fact and law, a party would not be allowed to raise it later on, in case such an objection was not raised at the earliest. We, however, find that the period of limitation would be three years as the matter would be covered by Article 55 of the Limitation Act as pointed out by the learned counsel for the respondent.Article 55 reads as under : ________________________________________________________________________ "Description of suit Period of limitation Time from which period begins to run 55. For compensation Three years When the contract is broken for the breach of any or (where there are successive contract, express of breaches) when the breach in implied not herein respect of which the suit is specially provided for. instituted occurs or (where the breach is continuing)when it ceases." In the case in hand, as indicated above, the notice terminating the contract is dated 26.9.1988 saying that "we are going to vacate your above plinths by 10.10.1988". The plaintiff replied to the notice saying that the defendant could not vacate the premises before 23.1.1990. However, the defendant vacated the premises on 10.10.1988. This is the date when the contract was broken and cause of action also accrued. The suit had been filed on 4.10.1991 i.e. within three years of vacating the premises. In view of the position indicated above we do not find any merit in the argument raised on behalf of the appellant that the suit of the plaintiff was barred by time. In the result, we find no substance in the appeal preferred by Food Corporation of India. 13. In view of the position indicated above we do not find any merit in the argument raised on behalf of the appellant that the suit of the plaintiff was barred by time. In the result, we find no substance in the appeal preferred by Food Corporation of India. 13. We also find no good reason to reduce the amount of damages to the extent of 6% merely because the Board of Directors had decided that the premises hired for three years may be continued for the same period but negotiations may be held for reducing the liability which may be not less than 5%. The plaintiff-appellant M/s. Babulal had, never agreed to any such suggestion. Once the measure of damages has been accepted as the amount of monthly rent of the plinths, unless there was some logical and cogent reason to reduce the same, it could not be done. The order of modification of the decree passed by the trial Court was not called in question. In our view, the decree has been modified without assigning any cogent reason for the same. Hence, that part of the judgment passed by the High Court is liable to be set aside. 14. In the result, Civil Appeal No. 3484 of 1997 titled Food Corpn. of India v. Babulal Agrawal is dismissed and Civil Appeal No. 3485 of 1997 titled Babulal Agrawal v. Food Corpn. of India is allowed and the decree passed by the trial Court is restored. Parties to bear their own costs. ...................